
🕓 4:00 PM ET
⏱ 30 Minutes
🎙 Live! Not Available On-Demand
You've thought about switching. They actually did it.
For years, Tractor Supply Company ran their facilities operations on a legacy platform. It worked, until it didn't. As they grew past 2,400 locations, they needed a system that could keep pace. What followed was a rigorous, two-year evaluation that ultimately led them to Fexa.
On March 18, we're sitting down (live!) with two people who lived it from the inside:
Myriah Kingen, Director of Facilities and Elizabeth Cox, Facilities Analyst.
No slides. No scripts. Just an honest conversation about what drove the switch, how they managed change across a massive organization, and what the experience has been like from evaluation through go-live.
This session is built for facilities leaders at multi-site brands who are:
- Evaluating platforms but stuck in analysis paralysis
- Worried about what switching actually looks like at scale
- Curious how a Fortune 500 retailer managed change across 52,000+ team members
- Looking for proof that a better way exists from someone who's lived it